My Shopping Cart My Downloads
Search the CII Store:  
 


2.02 - Design Effectiveness


Items 1 - 10 of 16

Page: 1 2

Next >>  

IR163-2
Onsite Design Tool for Project Planning, Second Edition
Details/Purchase
View Abstract
Members: FREE
Non-Members: $ 308.30

Description
The User’s Guide helps in installing and using the Onsite Design Tool for Project Planning (a Visual Basic program operating within Microsoft™ Access). The tool, which is essentially decision-support software, is designed to assist project teams in determining those design activities that should be performed on site, by project phase, to achieve improvements in user-selected performance measures. The tool is easy to use, and the Guide contains two case studies for easy reference.

Web download only

Reviewed by CII 23Jun04


RS233-1
Evaluation of Design Effectiveness
Details/Purchase
View Abstract
Members: $ 6.58
Non-Members: $ 26.30

Description
Presents up-to-date design effectiveness (DE) evaluation methodology and criteria, emphasizing the importance of proactive planning for DE. Identifies and characterizes supportive tools and processes for evaluating design effectiveness on projects of varying size and scope across all industry sectors.


RS245-1
Maximizing Engineering Value
Details/Purchase
View Abstract
Members: $ 6.58
Non-Members: $ 26.30

Description
Summarizes the process that was used to develop the Maximizing Engineering Value & Design Effectiveness Toolkit (IR 245-2). Through its examination of 64 engineering strategies, the book raises the industry's awareness of the broad range of issues and drivers that influence how engineering value on capital projects can be optimized. Includes a matrix that shows the level of impact of each of the 64 strategies on 11 project value objectives.


RS163-1
Onsite Design: When and How Much?
Details/Purchase
View Abstract
Members: $ 6.58
Non-Members: $ 26.30

Description
Addresses the onsite design issue and introduces a new CII compact disc, Onsite Design Tool for Project Planning. The research database shows that projects that use onsite design perform as well or better than those that do not in a variety of performance measurement categories.

Reviewed by CII 23Jun04


RS153-1
The Field Rework Index: Early Warning for Field Rework and Cost Growth
Details/Purchase
View Abstract
Members: $ 6.58
Non-Members: $ 26.30

Description
Presents a new tool, the Field Rework Index (FRI), to help predict probability of rework in the field. The one-page tool takes less than five minutes to use, and also indicates the probability of cost growth on a project.

Reviewed by CII 15Jul05


RS8-2
Input Variables Impacting Design Effectiveness
Details/Purchase
View Abstract
Members: $ 6.58
Non-Members: $ 26.30

Description
Examines the 10 input variables that have the greatest impact on design effectiveness. Recommends ways to achieve more effective designs and improved project success.

Reviewed by CII 23Jun04


RS8-1
Evaluation of Design Effectiveness
Details/Purchase
View Abstract
Members: $ 6.58
Non-Members: $ 26.30

Description
Addresses the major problems related to design performance. Discusses the criteria of design productivity and effectiveness. Describes a method for measuring design effectiveness that can be applied by the industry at large.

Reviewed by CII 23Jun04


RR245-11
Maximizing Engineering Value
Details/Purchase
View Abstract
Members: FREE
Non-Members: $ 129.88

Description
O’Connor, Singh, Univ. of Texas at Austin


RR233-11
Planning for, Facilitating, and Evaluating Design Effectiveness
Details/Purchase
View Abstract
Members: FREE
Non-Members: $ 194.82

Description
O’Connor, O’Brien, Jarrah, Wallner, Univ. of Texas at Austin


RR163-11
Onsite Design
Details/Purchase
View Abstract
Members: $ 48.71
Non-Members: $ 194.82

Description
Back, Prince, Clemson Univ.

Reviewed by CII 23Jun04



Items 1 - 10 of 16

Page: 1 2

Next >>  




Select a product
IR163-2
RS233-1
RS245-1
RS163-1
RS153-1
RS8-2
RS8-1
RR245-11
RR233-11
RR163-11
1 2 Next

Knowledge Areas
00 - General CII Information
01 - Project Planning
02 - Design Optimization
03 - Procurement and Materials Management
04 - Construction - Other
05 - Facility Startup and Operations
06 - Human Resources Management
07 - Project Organization and Management
08 - Business and Project Processes
09 - Project Controls
10 - Risk Management
11 - Safety, Health, and Environment
12 - Information Management and Technology Systems
13 - Globalization Issues
14 - Security
PIP

See also:
9.01 - Cost & Schedule Control
 
© 2010 Construction Industry Institute™ All rights reserved.   |   Privacy Policy
Cockrell School of Engineering