Add An Account
|
Log in
Join CII
Membership
Industries
Resources
Groups
Events
About CII
Awards
Blog
Search for:
Member List
CII's Impact
Downstream and Chemicals
Facilities and Healthcare
Manufacturing and Life Sciences
Power, Utilities, and Infrastructure
Upstream, Midstream, and Mining
Education
CII Executive Leadership Program
Online Education
Registered Providers
Professional Development Hours
Knowledge Base
About Knowledge Base
10-10 Metrics
Best Practices
Knowledge Areas
Project Functions or Roles
Project Phases
Ordering
PDRI Overview
Events Downloads
Fiatech Downloads
Performance Assessment
CII 10-10 Program
Performance Assessment System
Health Care Benchmarking
Code of Conduct
JIP Survey
Leadership Committees
Executive Committee
Sector Leadership Committee
Strategic Planning Committee
Board of Advisors
Sector Committees
Downstream and Chemicals
Facilities and Healthcare
Manufacturing and Life Sciences
Power, Utilities, and Infrastructure
Upstream, Midstream, and Mining
Standing Committees
Deployment Committee
Funded Studies Committee
Technology Committee
Research Teams
Active Research Teams
Sunset Research Teams
Communities for Business Advancement
Advanced Work Packaging
Data Analytics
Information Management
Modularization
Project Controls
Quality Management
Risk Management
Safety
Supply Chain Management
Partnerships
CII History
CII Mission, Vision, and Core Values
CII Staff
Meeting at CII
Director's Blog
Leadership Awards
Carroll H. Dunn Award of Excellence
Richard L. Tucker Leadership & Service Award
James B. Porter, Jr. Award for Technology Leadership
Distinguished Service Award
CII Executive Leadership Program
View All Events
View Events Downloads
Search for:
Search for:
Home
⟩
Resources
⟩
Knowledge Base
⟩
Best Practices
⟩
Advanced Work Packaging
Search for:
Advanced Work Packaging
Best Practice Definition
The overall process flow of all the detailed work packages (construction, engineering, and installation work packages). AWP is a planned, executable process that encompasses the work on an EPC project, beginning with initial planning and continuing through detailed design and construction execution. AWP provides the framework for productive and progressive construction, and presumes the existence of a construction execution plan.
Topic Summaries
Filter/Sort
Show Only:
Pick a Phase
Concept 2
Detailed Scope 2
Detailed Design (Engineering) 3
Procurement 2
Construction 3
Sort by:
Date
Title
Team ID
Bridging the Gap between Engineering and Construction Piping 3D Models to Support Advanced Work Packaging
RT-TC-01
2018 - 2019
Publications: 1
Presentations: 0
Tools: 1
KA: Construction Execution
Transforming the Industry: Making the Case for AWP as a Standard (Best) Practice
RT-319
2013 - 2015
Publications: 3
Presentations: 3
Tools: 1
KA: Construction Execution
Enhanced Work Packaging: Design through WorkFace Execution (Best Practice)
RT-272
2009 - 2011
Publications: 4
Presentations: 6
Tools: 1
KA: Construction Execution
Portals
Select one
Knowledge Areas
Project Phases
Project Functions or Roles
10-10 Metrics
Best Practices
Portals
10-10 Metrics
Best Practices
Knowledge Areas
Project Functions or Roles
Project Phases
Events Downloads
Fiatech Downloads
Ordering
PDRI Overview
More filter options