Based on the survey results, the team distinguished 14 design deliverables as problematic and merged them into the following seven major problematic design deliverables:
- Roof details
- Mechanical controls
- Exterior wall systems
- Low-voltage systems
- Installed specialty equipment
- Project phasing
- Delegated design
Additionally, the team identified 47 design defects through SME interviews.