Skip to Content (custom)
Member Exclusive

Construction Input Assessment in Front End Planning - Participant Handbook

Publication No
EM241-21A
Type
Education Material
Publication Date
Jun 01, 2010
Research Team
RT-241
DOCUMENT DETAILS
Abstract
Filters & Tags
Abstract

Many projects do not include adequate construction input during front end planning (FEP), resulting in projects falling short of their goals. Historically the primary stakeholders in a project (i.e. owners, designers, and constructors) are not aligned and tend to operate in their own domains. As a result the needed collaboration is not obtained and projects do not achieve the level of success that is possible.

CII has developed an Excel®-based decision aid—Construction Input Assessment Tool (CIAT)—to help get construction input at the right time and level of effort during FEP. CIAT provides project stakeholders with a means of determining project items and activities that require construction input during front end planning. It also will assist in evaluating if adequate construction expertise is available or if outside sources are needed.

This education module provides the venue for teaching the background of the tool, how, when and with whom to employ it, and provides an opportunity to use the tool in hypothetical situations.

Education modules are not available for download from the Internet.

This publication contains IR241-2, Construction Input Assessment Tool (CIAT), Version 1.1

Module Length: 4 hours

Filters & Tags
Research Topic
Optimizing the Value of Construction in Front End Planning
Keywords
Front End Planning, Pre-Project Planning, Constructability, Team Alignment, Construction Input Assessment Tool, CIAT, Lessons Learned, rt241