Industrial Engineering/Manufacturing Techniques for Enhancing Construction Project Performance

Publication No
RR265-11
Type
Checklist/Flowchart/Matrix, Guidelines/Suggestions
Publication Date
Dec 01, 2012
Pages
274
Research Team
RT-265
DOCUMENT DETAILS
Abstract
Key Findings
Filters & Tags
Abstract
Previous CII research suggests that field project operations are quite inefficient. For example, the final report of Research Team (RT) 191 indicates that "NVA (non-value adding) activities consume between 50 and 75% of the productive time on the
Key Findings

RR265-11, Problem Identification Flowchart

Each flowchart is a decision tree that leads site personnel from problem identification to IE techniques that might improve the situation. There is a flowchart for each of the 5 NVA categories: (RR265-11, p. 31)

  • Equipment
  • Materials
  • Tools
  • Information
  • Personnel
RR265-11, Planning Assistant 

This tool addresses the use of IE techniques during the planning phase that can prevent problems later. The purpose of the Planning Assistant is to provide the project team with a systematic approach (step-by-step instructions) for planning the layout of a construction site. (RR265-11, p. 55)
Filters & Tags
Research Topic
How to Use Industrial Engineering/Manufacturing Techniques for Enhancing Project Performance
Keywords
Non-Value Adding, NVA, Industrial Engineering, Industrial Engineering Techniques, Manufacturing Techniques, IE Techniques, Lean Implementation, Construction Productivity, rt265