BIM Project Execution Planning Guide, Version 2.0
The team is to map the process to understand the overall BIM process, to identify the information exchanges to be shared between multiple parties, and to clearly define the processes performed for the identified BIM uses. (RES-CPF 2010-2, page 15)
Level 1: BIM Overview Map showing the relationship of BIM Uses which will be employed on a project and containing the high-level information exchanges that occur throughout the project lifecycle.
Level 2: Detailed BIM Use Process Maps created for each identified BIM Use on a project to clearly define the sequence of various processes to be performed and to identify: responsible parties for each process, reference information content, and the information exchanges which will be created and shared with other processes.
(RES-CPF 2010-2, page 27)
- Meeting 1: Identify BIM Goals and Uses.
- Meeting 2: Design BIM Project Execution Process.
- Meeting 3: Develop Information Exchanges and Define Supporting Infrastructure for BIM Implementation.
- Meeting 4: Review Final BIM Project Execution Plan.
(RES-CPF 2010-2, page 41)
- Each project team needs a BIM Champion.
- Owner involvement is critical throughout the entire process.
- It is essential that the project team fosters an open environment of sharing and collaboration.
- The BIM Project Execution Planning Procedure can be adapted to different contracting structures.
- There is great value in early planning.
- The BIM Plan should be treated as a living document.
- Once an initial plan is developed, it must be reviewed regularly.
- The appropriate resources must be made available to ensure planning success.
- Developing an organizational BIM Project Execution Plan before project inception can decrease project planning time.
- The BIM Project Execution Planning Procedure can be adapted for multiple uses and situations beyond the original scope of the project.
This guide provides a structured procedure for creating and implementing a BIM Project Execution Plan. This guide is directed toward readers with a fundamental understanding of BIM concepts. The guide includes worksheets, maps and templates for use in the BIM process, including:
- BIM Goal Worksheet
- BIM Use Descriptions
- BIM Use Analysis Worksheet
- Template Process Maps
- Lab Example Process Maps
- Information Exchange Worksheet
- BIM Project Execution Plan Template