Project Control for Construction

Publication No
RS6-5
Type
Research & Development Product
Publication Date
Sep 01, 1987
Pages
48
Research Team
RT-006g
DOCUMENT DETAILS
Abstract
Key Findings
Filters & Tags
Abstract
The potential for the success of a construction project is largely dependent upon the quality of the project controls system and staff assigned because that function is really the eyes and ears of management. Lacking this function or operating with a
Key Findings
The success of a construction project is largely dependent upon the quality of the project controls system and staff assigned as the eyes and ears of management. There must be integrated project control. Cost control is not cost accounting. The Cost Breakdown Structure is designed to catalog budgeted and actual expenditures to identify cost problems, establishing cost trends, and provide cost data for future projects. Since the major cost variable on a construction project is labor productivity, a main component of the cost control subsystem is the tracking of work-hours with quantity tracking. Schedule control requires a Control Schedule at the outset of construction. If it’s too detailed, it loses its usefulness. Arbitrary or false logic causes field personnel to lose confidence in it. A sure sign of schedule planning failure is when project control engineers are found updating schedules while the field personnel are planning their work as best they know how and reporting the results. Materials control is included in the Materials Management Program. Since materials deliveries directly affect the ability to schedule work, materials tracking should be a subsystem within the project controls system and tied to the scheduling system. The source of materials tracking information will come from procurement and expediting personnel. Positive coordination and cooperation with those personnel must be established and maintained throughout the project’s life.
Filters & Tags
Research Topic
Cost/Schedule Controls
Keywords
Project controls, Planning and Scheduling, Change Management, Cost control, Scope and Execution Strategy, Work packaging, Estimating, Work Breakdown Structure, Schedule control, Code of Accounts, Schedule compression, Earned Value, rt6