Skip to Content (custom)

A Guide to Instantaneous Project Controls

Publication No
IR316-2
Type
Excel spreadsheet
Publication Date
Apr 01, 2016
Pages
66
Research Team
RT-316
DOCUMENT DETAILS
Abstract
Key Findings
Filters & Tags
Abstract

CII established Research Team (RT) 316, Instantaneous Project Controls Systems, to identify, synthesize, and prioritize the key strategies and critical success factors of instantaneous project status reporting. The purpose was to streamline current project controls processes such that project teams can readily obtain the information they need to respond effectively to trends and events. To accomplish its goals, the team conducted surveys and case study interviews. The case study findings generated a maturity matrix comprising nine instantaneous controls implementation strategies, grouped into three main categories: organizational behavior, project controls, and advanced information technologies.

This maturity matrix was the basis of the three tools the team developed: 1) the Instantaneous Quotient (IQ) tool, which provides a thorough assessment of the maturity of an organization’s instantaneous controls capability; 2) the Quick Assessment (QA) tool, which gives an overview of an organization’s strategic gaps and weaknesses; and 3) the Workflow Implementation Process tool, which prioritizes and plans for the implementation of the nine strategies. Rather than take a project-by-project approach, these tools support an organizational focus on instantaneous controls.

Following this introduction, Chapter 2 provides an in-depth discussion of the maturity matrix. Next, Chapters 3 and 4 offer guidance on using the IQ and QA tools, respectively. Chapter 5 then explains ways to leverage the Workflow Implementation Process tool, and Chapter 6 addresses practical implementation considerations, such as when or how to use the tools. Finally, Chapter 7 presents narratives of three industry implementations of instantaneous controls, each with different scopes and varying degrees of success; each account relates the level of success case to the degree each of the nine maturity matrix strategies is implemented.

Key Findings
IR316-2, A Guide to Instantaneous Project Controls (Volume I) 

The resource includes 3 Tools:
  • Quick Assessment (QA) – The QA tool provides a high-level assessment of the maturity level of the nine strategies, along with guidance for improvement. The QA tool assesses maturity on the basis of one question per strategy.
  • Instantaneous Quotient (IQ) – The IQ tool provides a detailed assessment of the maturity level of the nine strategies. The IQ assessment relies on several questions per strategy.
  • Workflow Implementation Process – This tool offers guidance on the steps an organization should take to plan and implement the strategies recommended in this research. The 10-step Workflow Process is shown below.
IR316-2, A Guide to Instantaneous Project Controls (Volume II) - Case Studies
Filters & Tags
Research Topic
Instantaneous Project Control Systems
Keywords
Project Controls, Instantaneous Project Controls, Quick Assessment, Instantaneous Quotient, Workflow Implementationn Process, Maturity Matrix, rt316