Work Packaging for Project Control

Publication No
SD-28
Type
Academic Document
Publication Date
Aug 01, 1987
Pages
108
Research Team
RT-006g
DOCUMENT DETAILS
Abstract
Filters & Tags
Abstract
Purpose of the Report To be successful in preventing cost and schedule overruns in the construction of a facility, the project must have a formal control system. “An effective control system must he responsive to the needs of all users at the
Filters & Tags
Research Topic
Cost/Schedule Controls
Keywords
Project controls, Planning and Scheduling, Change Management, Cost control, Scope and Execution Strategy, Work packaging, Estimating, Work Breakdown Structure, Schedule control, Code of Accounts, Schedule compression, Earned Value, rt6